0
Chu Lai OEZ Investment Bank

Chu Lai OEZ Telecommunications Network

Chu Lai OEZ Bonded Warehouse Project

Chu Lai OEZ Warehouse Project

Chu Lai OEZ Textile Project

Chu Lai OEZ & Vietnamese Government Seaport Rehabilitation Project

Chu Lai OEZ Sheet Metal & Heavy Plate Manufacturing Facility Project

Water and Wastewater Treatment Plant Project

Chu Lai Shipyard Project

Chu Lai Housing Project

Chu Lai Hotel and Resort Project

Other Considered Future Projects



   
Chu Lai OEZ Textile Project

The CLIDC have agreed to build a textile warehouse complex to accommodate the storage of imported fibers, fabrics and textile related equipment for sale and distribution to local area textile businesses. The first textile warehouses to be built will consist of four warehouse buildings of approximately 30X60 meters in size each. The buildings will be constructed of pre-engineered steel buildings imported from the United States.

Each warehouse will have climate control capabilities, an inventory control system, materials handling system, state of the art telecom system and security system. Additionally, the CLIDC agree to build, run and operate a textile facility within the textile warehouse complex area to process and fabricate materials, fabrics and finished textile goods for export. The first textile manufacturing warehouses to be built will follow the document �Garment Assembly and Textile Factory Plan� developed by Mr. Sencam Bach a CLIDC Director as closely as is possible.

The buildings will be constructed of pre-engineered steel buildings imported from the United States. Each warehouse will have climate control capabilities, an inventory control system, materials handling system, state of the art telecom system and security system also imported from the United States.